Spring hangers · Constant supports · Rigid hangers

BOILER HANGERS

Pipe suspension and support systems for boiler steam lines, superheater tubes and high-temperature piping — designed to absorb thermal expansion while maintaining the required design load. Supplied in accordance with ASME B31.1, MSS-SP-58, GB/T 12777 and EN 13480, with complete project documentation.

Spring hangers and constant supports
Rigid hangers and pipe supports
ASME B31.1 · MSS-SP-58 · GB/T 12777
EN 10204 3.1 material certificates
Boiler Hangers — Spring Supports and Pipe Suspension Systems

Basics

What Are Boiler Hangers?

Boiler hangers are pipe suspension devices that support the weight of steam lines, superheater tubes and high-temperature piping while allowing controlled thermal movement between the cold and operating positions.

Why Hangers Matter in a Boiler System

High-temperature boiler piping expands significantly between shutdown and operating temperature — a 30 m steam line operating at 540 °C may grow by 250 mm or more. This thermal movement must be absorbed without transferring excessive forces to pressure vessels, nozzles or rotating equipment. Hangers apply the correct support load at each point along the piping route, allowing the line to move freely without sagging or lifting from its supports.

Incorrect hanger selection — for example, using a rigid support where a spring support is required — can overload nozzles and generate stress on pressure parts, which may lead to cracking over time. Correct hanger type selection and load setting are therefore critical parts of boiler piping engineering.

Variable Spring
The load varies with spring compression. Suitable when a load variation of ±25% from the hot load is acceptable.
Constant Support
Maintains a constant load throughout the travel range. Specified for main steam, reheater lines and critical nozzle connections.
Rigid Hanger
Fixed support for locations without vertical thermal movement. Used as anchors and supports for cold pipe runs.
ORL Power boiler hanger supply

What We Supply

  • Variable spring hangers with coil spring assemblies
  • Constant supports / constant load hangers
  • Rigid rod hangers and clevis assemblies
  • Pipe clamps, U-bolts and beam attachments
  • Load test certificates and inspection reports
  • EN 10204 3.1 material certificates
Request a Quote

Product Range

Types and Selection

Select the hanger type according to thermal movement requirements, load criticality and the location of the pipe in the boiler system.

Spring Hangers

Coil-spring units that provide variable support according to pipe movement. They are the standard choice for most boiler piping locations where load variation within the travel range is acceptable.

  • Load range: 50 – 50,000 lb (22 – 22,680 kg)
  • Travel: 25 – 200 mm (1" – 8") standard
  • Load variation: ±25% over the full travel range
  • ASME B31.1 / MSS-SP-58 / GB/T 12777
Quote This Type

Constant Support Hangers

Mechanism-based units that maintain a constant load over the full travel range. Specified for main steam piping, reheater piping and rotating-equipment connections where load variation must be minimized.

  • Load range: 100 – 100,000 lb (45 – 45,360 kg)
  • Travel: 50 – 300 mm (2" – 12") standard
  • Load variation: maximum ±6% over the full travel range
  • ASME B31.1 / MSS-SP-58 / EN 13480
Quote This Type

Rigid Hangers and Supports

Fixed-length rod hangers, clevis assemblies and pipe clamps for locations without vertical thermal movement — cold runs, anchor points and lateral restraint positions.

  • Load range: 25 – 25,000 lb (11 – 11,340 kg)
  • Threaded rod adjustment of ±50 mm
  • Pipe clamps, U-bolts and clevis types
  • Carbon steel, alloy steel or SS 304/316L
Quote This Type
Need a mixed system with spring hangers, constant supports and rigid hangers?

We can quote all hanger types from a pipe stress isometric or BOM — one order and one document package.

Get a Combined Quote

Technical Data

Materials and Specifications

Load capacities, travel ranges and material grades — send us your pipe stress isometric or BOM, and we will confirm hanger type, load setting and travel range for each support point.

Performance Specifications by Type

Spring Hangers (Variable Support)
Load Range 50 – 50,000 lb / 22 – 22,680 kg
Standard Travel 25 – 200 mm (1" – 8")
Load Variation ±25% over the full travel range
Constant Support Hangers
Load Range 100 – 100,000 lb / 45 – 45,360 kg
Standard Travel 50 – 300 mm (2" – 12")
Load Variation Maximum ±6% over the full travel range
Rigid Hangers
Load Range 25 – 25,000 lb / 11 – 11,340 kg
Rod Adjustment Threaded ±50 mm

Material Grades

CS
Carbon Steel
ASTM: A36, A572 Gr.50
GB: Q235B, Q345B
Standard applications, with hot-dip galvanizing for outdoor or corrosive environments.
SS
Stainless Steel
ASTM: A240 304 / 316L
EN: 1.4301 / 1.4404
WtE, chemical and marine environments where carbon steel corrosion is not acceptable.
AS
Alloy Steel
ASTM: A335 P11 / P22
GB: 15CrMo, 12Cr1MoV
High-temperature hanger rods for contact with steam lines above 450 °C.

Design Standards

ASME B31.1 — Power Piping. Load and installation requirements for pipe hangers in power plants.
MSS-SP-58 — Pipe Hangers and Supports. Material, design and fabrication specification.
GB/T 12777 — Chinese standard for spring supports. Default option for GB-code projects.
EN 13480 — Metallic industrial piping. European equivalent requirements for hanger systems.

Quality Certifications

ISO 9001
ISO 9001:2015
Quality management system covering material receiving, production, load testing and document control.
ASME U
ASME U Stamp
ASME authorization for pressure vessel manufacturing. Supports hanger supply for ASME B31.1 power plant projects.
EN 10204
EN 10204 3.1 MTC
Material test certificates with chemical composition and mechanical property verification for all structural components.

Why Choose ORL Power

Hangers Supplied Together with Boiler Pressure Parts

Sourcing hangers from the same supplier that delivers superheaters, headers and steam drums allows one QC team to cover both the pressure boundary and the support system.

100% Load Tested

Every spring hanger and constant support unit is tested on calibrated equipment before delivery. A test report with actual load-versus-deflection data is provided for each unit.

Boiler Piping Knowledge

We supply the pressure parts these hangers support — superheaters, reheaters, headers and steam drums. We understand load points, nozzle sensitivity and thermal movement patterns from a boiler engineering perspective.

Complete Documentation Package

EN 10204 3.1 material certificates, load test reports, dimensional inspection records and installation setting sheets — all documents are traceable to the serial number of each unit.

Combined Shipment with Pressure Parts

Hangers can be packed and shipped in the same container as superheaters, headers and other pressure parts — one shipment, one customs declaration and lower freight cost for the complete boiler package.

Third-Party Inspection Support

We routinely coordinate with SGS, TÜV, BV and customer inspection teams. Hold points for material verification, load testing and final release can be defined in an agreed ITP before production starts.

Multi-Standard Capability

ASME B31.1, MSS-SP-58, GB/T 12777 and EN 13480 — we manufacture according to the standard specified in your project. You do not need separate suppliers for different design codes.

Source hangers together with your boiler pressure parts.

Send your BOM or pipe stress isometric — we can quote hangers, pressure parts and steel structure together.

Get a Combined Quote

Industries Served

Who Requests Boiler Hangers

Every boiler with elevated steam lines, superheater tubes or high-temperature piping requires a hanger system to support pipe weight and absorb thermal movement.

Power Plants

Main steam, reheater and feedwater piping in CFB, coal-fired, biomass and gas-fired plants. Constant supports are specified for critical nozzle connections at turbine and steam drum level.

CFB · Coal · Biomass · Gas · HRSG

Sugar Mills

Process steam piping at 300–500 °C in bagasse-fired cogeneration boilers. Spring hangers are used for steam distribution headers and evaporator feed lines; rigid supports are used for anchor points.

Bagasse · Biomass · Cogeneration

Waste Heat Recovery

HRSG and waste heat boilers in steel, cement and chemical plants. Compact hanger arrangements around existing process equipment — spring hangers are used for the variable thermal movement profiles typical of waste heat systems.

Steel · Cement · Chemical

Waste Incineration

MSW and WtE boiler piping at 300–500 °C. Stainless steel or coated alloy hangers are specified in zones exposed to flue gas. Constant supports are used for membrane wall suspension connections.

MSW · WtE · Industrial Waste

EPC Contractors

EPC and turnkey contractors sourcing the complete boiler island — pressure parts, steel structure and hanger systems — from one supplier to reduce procurement interfaces and simplify third-party inspection coverage.

Turnkey · EPC · FIDIC

O&M Replacement

Plant operators replacing failed or out-of-range hangers during scheduled outages. We remanufacture according to original load and travel specifications based on nameplate data or on-site measurements.

Retrofit · Replacement · O&M

Manufacturing Process

Factory and Process

From raw material receiving to load testing, calibration and packing — this is how ORL Power controls each stage of boiler hanger manufacturing.

01
Incoming Material Inspection
Mill certificates are verified for structural components and spring steel. Chemical composition and mechanical properties are reviewed before cutting.
02
Machining and Component Fabrication
Spring coils, casing plates and rod assemblies are machined according to drawing tolerances. Thread pitch and rod dimensions are checked by batch.
03
Assembly and Presetting
Spring hangers are assembled and preset to the cold-position load according to the order BOM. The load indicator position is checked against the calculation sheet.
04
100% Load Testing
Every spring unit and constant support is tested on calibrated equipment. Actual load versus deflection is recorded; out-of-tolerance units are rejected and rebuilt.
05
Surface Treatment
Hot-dip galvanizing, painting or raw finish is applied according to specification. Spring elements are protected during surface treatment to avoid coating contamination.
06
Serial Marking, Packing and Documentation
The serial number is stamped on the unit, the travel indicator is locked for shipment and the installation setting sheet is attached. The load test report, material certificates and packing list are sent with each order.

Project Record

Hangers Supplied as Part of the Boiler Package

20+
Years of Experience
500+
Projects Delivered
50+
Countries Served
100%
Load Tested

Frequently Asked Questions

Boiler Hanger FAQ

Common questions from EPC contractors and piping engineers requesting hanger systems for boiler projects.

How do I choose between a spring hanger and a constant support hanger?

The selection criterion is load variation sensitivity. The support force of a spring hanger changes as the pipe moves — typically about 25% of the hot load over the full travel range. This is acceptable for most economizer, convection tube and process steam piping locations where nozzle loads are not critical.

A constant support hanger is required when load variation cannot be tolerated — mainly at pressure vessel nozzle connections such as steam drums and superheater headers, turbine inlets and any location where pipe stress analysis shows that spring-generated variation exceeds the allowable nozzle load. Pipe stress analysis software such as Caesar II or ROHR2 will identify these locations. If you have a stress isometric or BOM, send it to us and we will confirm the hanger type selection for each support point.

What is the difference between hot load and cold load settings?

Hot load is the support force required when the pipe is at operating temperature and pressure — this is the design load from pipe stress analysis and is the load the hanger must deliver in service.

Cold load is the hanger setting at ambient temperature before hydrostatic testing and start-up. Because the pipe moves from the cold position to the hot position during start-up, the spring is preset to a position that delivers the correct hot load once the pipe reaches its operating position. We set each hanger to the cold-load position before delivery and provide a setting sheet confirming the cold indicator position. Installers lock the hanger travel during construction and release the lock before start-up.

What information is required to prepare a boiler hanger quotation?

The fastest way to quote is to provide a pipe hanger bill of materials (BOM) from the pipe stress engineer or boiler OEM. A typical BOM lists each support point with hanger type (spring / constant / rigid), hot load in kg or lb, travel range in mm, pipe operating temperature and applicable design standard.

If the BOM is not available yet, we can prepare a preliminary estimate based on boiler type and steam capacity, the approximate number and location of support points, operating temperature and pressure of the steam lines, and the applicable design code such as ASME B31.1, GB or EN.

What documentation do you provide with each hanger unit?

The standard documentation package for each unit includes the EN 10204 3.1 material test certificate for structural steel components, load test report with actual load-versus-deflection curve, dimensional inspection record, installation setting sheet showing cold indicator position and hot load, and packing list linked to hanger BOM tag numbers.

For projects with a formal QCP/ITP, we can define hold points and witness points for material verification, assembly inspection and load test acceptance. All documents are traceable to individual serial numbers for each unit.

Can you supply replacement hangers for an existing boiler?

Yes. For replacement units, we need the nameplate information of the existing hanger — usually stamped on the casing or attached tag — including hanger type designation, hot load, travel range and spring rate. If the nameplate is not readable, we can manufacture according to on-site measurements and pipe operating conditions. Replacement hangers are preset to the same cold setting as the original units, so no recalibration is required during the outage. We can also manufacture to match proprietary designs from other hanger manufacturers if dimensions and performance data are provided.

Can you supply hangers together with boiler pressure parts?

Yes. ORL Power supplies complete boiler pressure part packages — superheaters, reheaters, economizers, steam drums, headers and water walls — and can include the hanger system in the same order. All components can be shipped together in the same container, reducing freight cost and customs procedures. One QC team covers inspection of the complete package, and one document file covers all pressure parts and hangers for the project. This is the standard arrangement for EPC contractors requesting a complete boiler island from a single source.

Get a Quote

Contact Our Engineering Team

Share your hanger BOM or piping isometrics — we will confirm hanger type, load, travel, material and delivery time in one response.

Get Your Boiler Hanger Quotation

Share your drawings or specifications — we respond within 24 hours.

Email
orl@orlpower.com
Phone / WhatsApp
+86-187 5115 1030
Location
Jiangsu, China

What to Include in Your Inquiry

  • • Hanger BOM or pipe stress isometric, preferred
  • • Hot load and cold load for each support point
  • • Required vertical travel and movement direction
  • • Required hanger type: spring / constant / rigid
  • • Surface treatment: hot-dip galvanized / painted
  • • Steel grade and applicable code
  • • Destination port and required delivery date